
Huakeshi Stadium
Harbin
cantilever truss canopy spanning 38 m over grandstand, ~480 t steel, PTFE membrane roofing. Heat-load designed for 48 °C peak, full BIM coordination with seating bowl contractor.
WZH Construction Group delivered this stadium project in Doha, Qatar with in-house shop-drawing detailing, factory fabrication, surface treatment and delivery (approx. 480 tons of steel), supplied to the client's drawings and schedule.
Phone: +86 186 1064 8788 | Email: vip@wzhjt.com | WhatsApp: 8618610648788