Jilin Jianlong 800K-Ton Cold Rolling Mill

Project Overview

Jilin Jianlong 800K-ton cold rolling mill, 30,000㎡, 39m height, pipe truss/heavy steel structure with 11,000 tons of steel.

Jilin Jianlong 800K-Ton Cold Rolling Mill — Industrial Plant in Jilin Province, steel structure project by WZH Construction Group

Technical Specifications

Why Choose WZH

WZH Construction Group delivered this industrial plant project in Jilin Province with in-house shop-drawing detailing, factory fabrication, surface treatment and delivery (approx. 11000 tons of steel), supplied to the client's drawings and schedule.

Frequently Asked Questions

What is the typical delivery time?
Standard steel structure projects take 30-90 days, depending on design complexity, tonnage, and surface treatment requirements.
Do you provide design services?
Yes, we hold Class A steel structure design qualification and provide full BIM services (Tekla Structures) from concept to detail design.
How is quality assured?
Full ISO 9001 quality management. Welding per AWS D1.1/EN 1090. 100% NDT inspection on critical joints.

Get a Free Quote

Phone: +86 186 1064 8788 | Email: vip@wzhjt.com | WhatsApp: 8618610648788

Get a Free Quote | View All Projects

Related Projects