Sichuan Airlines Harbin Operations Control Base Hangar

Project Overview

Large-span aircraft maintenance hangar with space frame structure, capable of accommodating large commercial aircraft for maintenance.

Sichuan Airlines Harbin Operations Control Base Hangar — industrial in Harbin, steel structure project by WZH Construction Group

Technical Specifications

Why Choose WZH

WZH Construction Group delivered this industrial project in Harbin with in-house shop-drawing detailing, factory fabrication, surface treatment and delivery, supplied to the client's drawings and schedule.

Frequently Asked Questions

What is the typical delivery time?
Standard steel structure projects take 30-90 days, depending on design complexity, tonnage, and surface treatment requirements.
Do you provide design services?
Yes, we hold Class A steel structure design qualification and provide full BIM services (Tekla Structures) from concept to detail design.
How is quality assured?
Full ISO 9001 quality management. Welding per AWS D1.1/EN 1090. 100% NDT inspection on critical joints.

Get a Free Quote

Phone: +86 186 1064 8788 | Email: vip@wzhjt.com | WhatsApp: 8618610648788

Get a Free Quote | View All Projects

Related Projects